Flyover bridge for special transports in Ostrowo
As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gdynia to Osieki Lęborskie, the JSK450 beam bridge was used to increase the parameters of the existing crossing in Ostrowo (Pomeranian Voivodeship) as a bridge above the existing bridge (so-called flyover). The crossing, 35m long (with ramps) and 5.7m wide, was completed in just a few hours.
Project details
Solution
Beam Bridge
Type
JSK-JBB
Length
35m
Width
5,7m
Load
Special vehicle c.400t, local regular traffic